Our music video was created with a various different types of shots and camera angels.
I have broken down the video into sections and commented on the different skills used.

This is our opening shot. The camera zooms into the top right window and just before the music changes tempo we cut to the next shot about (7secs). We took a still photo and zoomed in using the software on the computer.

This is s shot of the boys getting up ready to leave, Becca managed to use the cutting and reversal tool to make us jump up and down, this worked really well and we timed it perfectly with the "choppy" bit of the music.

Here we zoom in onto the computer screen, we weren't able to to a tripod into such a small space, so we reseted the camera on our knee's to get a stable shot.

This is the boys leaving the house, here we pan from right to left, following the action as it happens. We weren't able to get a tripod for this part of filming so we rested the camera on Nichole's shoulders and pivoted the camera around.
For this shot, as the boys drive past, we had to use hand held techniques, but fortunately Vicky had some steady hands!. 
This was the reversal shot of the shot above. In order to get a smooth moving shot we drove past the girls with the camera resting on the car door. It would have been good to use a track and dolly but we didn't have a budget that big to afford that sort of technology.
BELOW This is one of the shots we didn't use. This happened because we forgot the set the white balance and aperture, we also forgot to properly focus. However after we correct our mistake we got a really clear shot.


For this shot we asked 2 members of the public to stand outside of the pub to create a "busy" atmosphere, we would have preferred a club but none were open at that time.

This Long shot of the sea front was done by holding the camera on the car and trying to get a smooth steady shot, after several tries we eventually got it.
Overall i am very pleased with the finished product as we have all worked hard to accomplish the task. It cost more and took a lot longer than i expected and i hope my grade truly reflects the hard work my group and me have put into this project.
